Jaxon's Bathroom and the girls bathroom tile floor and showers are all done! Everything is glued down; now, they just need to grout it!
The master shower and bathroom is quite the hold up. Why? I don't even know. Seriously, hardly any progress to report after a week. :(
The playroom is striped!! I love it! And a ceiling fan!! Yay!
But, other progress was made. The security system and air conditioners units were put in!!
What's left?
1. Finish tiling master bathroom, and kitchen floors.
2. Wood floors and carpet floors.
3. Paint the trim outside, and stain the decking outside.
4. pour concrete sidewalks/driveway outside.
5. Install the propane tank.
6. Rock the Vent-a-Hood in the kitchen.
7. Paint the baseboards, and touch-ups inside.
8. Paint the garage.
9. Glaze the Laundry Room cabinets.
10. Put Hardware on.
11. Install appliances.
12. Finish hanging lighting fixtures.
13. Measure and install mirrors for bathrooms.
14. Lay wallpaper in powder bathroom.
15. Do some landscaping.
Can it be done in 3 weeks? :)