A month ago I made a list of "things left to do." There were 15 things; it feels good to mark off 6 of them!

Hardware is on the cabinets!


A Doorbell!


And a front door!


Glass top Desk


Mirrors are put in, in all the bathrooms!




Master bathroom floor grouted, but they have not re-tiled the bathtub surround.  


Trim kit put on refrigerator/freezer! This better hold all the food we need!  


9 Things to Go!
Shutters installed.
Paint the garage.
Tile the Tub Surround and Vent-a-hood.
Paint the baseboards, and touch ups. 
Paint the trim outside, and stain the decking.
Lay Wallpaper in Powder Bathroom.
Do landscaping. 
Pour concrete for sidewalks.
Finish wood floor/carpet floors.